What is the best point estimate for the population's standard deviation if the sample standard deviation is 37.3

Answers

Answer 1

Answer:

The best point estimate for the population's standard deviation is 37.3.

Step-by-step explanation:

Best point estimate:

The best point estimate for the population mean is the sample mean.

The best point estimate for the population standard deviation is the sample standard deviation.

In this question:

Sample standard deviation of 37.3, and thus, the best point estimate for the population's standard deviation is 37.3.


Related Questions

The number formed by adding 1 to the greatest 8 – digit number is?

Answers

Answer:

the answer would be 100,000,000

Greatest 8 Digit Number: 99,999,999

Adding 1 = 99999999+1

= 100,000,000

Must click thanks and mark brainliest

A person's email for one day contained a total of 78 messages. The number of spam
messages was two less than four times the number of other messages. How many of
the email messages were spam?

Answers

Answer:

62 of the email messages were spam

Step-by-step explanation:

Let the number of spam and other messages be s and o respectively.

Total number of messages= 78

s +o= 78 -----(1)

s= 4o -2 -----(2)

Substitute (2) into (1):

4o -2 +o= 78

Simplify:

5o -2= 78

+2 on both sides:

5o= 78 +2

5o= 80

Divide both sides by 5:

o= 80 ÷5

o= 16

Since s +o= 78, s= 78 -o.

s= 78 -16

s= 62

1/6+4/18 in simplest form

Answers

Answer:

7/18

Step-by-step explanation:

1/6 x 3 = 3/18

3/18 + 4/18 = 7/18

Answer:

7/18

Step-by-step explanation:

Make the denominators the same!

You can turn 1/6 into 3/18 by multiplying the numerator and denominator by 3. Then you add the numerators of 3/18 and 4/18 together to get 7/18.

It can't be simplified any further :)

use induction method to prove that 1.2^2+2.3^2+3.4^2+...+r(r+1)^2= n(n+1)(3n^2+11n+10)/12

Answers

Base case (n = 1):

• left side = 1×2² = 4

• right side = 1×(1 + 1)×(3×1² + 11×1 + 10)/12 = 4

Induction hypothesis: Assume equality holds for n = k, so that

1×2² + 2×3² + 3×4² + … + k × (k + 1)² = k × (k + 1) × (3k ² + 11k + 10)/12

Induction step (n = k + 1):

1×2² + 2×3² + 3×4² + … + k × (k + 1)² + (k + 1) × (k + 2)²

= k × (k + 1) × (3k ² + 11k + 10)/12 + (k + 1) × (k + 2)²

= (k + 1)/12 × (k × (3k ² + 11k + 10) + 12 × (k + 2)²)

= (k + 1)/12 × ((3k ³ + 11k ² + 10k) + 12 × (k ² + 4k + 4))

= (k + 1)/12 × (3k ³ + 23k ² + 58k + 48)

= (k + 1)/12 × (3k ³ + 23k ² + 58k + 48)

On the right side, we want to end up with

(k + 1) × (k + 2) × (3 (k + 1) ² + 11 (k + 1) + 10)/12

which suggests that k + 2 should be factor of the cubic. Indeed, we have

3k ³ + 23k ² + 58k + 48 = (k + 2) (3k ² + 17k + 24)

and we can rewrite the remaining quadratic as

3k ² + 17k + 24 = 3 (k + 1)² + 11 (k + 1) + 10

so we would arrive at the desired conclusion.

To see how the above rewriting is possible, we want to find coefficients a, b, and c such that

3k ² + 17k + 24 = a (k + 1)² + b (k + 1) + c

Expand the right side and collect like powers of k :

3k ² + 17k + 24 = ak ² + (2a + b) k + a + b + c

==>   a = 3   and   2a + b = 17   and   a + b + c = 24

==>   a = 3, b = 11, c = 10

Write an equation for the following: y varies directly with x. Find K
when x=4 and y=5.

Answers

Answer:

4/5

Step-by-step explanation:

y varies as x

y=kx

k=x/y

A 10-item statistics quiz was given to 30 students. The table below gives the scores received along with the corresponding frequencies.

A 2-column table with 6 rows. Column 1 is labeled score with entries 5, 6, 7, 8, 9, 10. Column 2 is labeled Frequency with entries 1, 2, 5, 5, 7, 10.

What was the mean score on the quiz?

7.5
8.5
9
10

Answers

Answer:

Should be (B).

8.5

ED2021

Answer: B

Step-by-step explanation:

(07.04 MC)
Jim is designing a seesaw for a children's park. The seesaw should make an angle of 30' with the ground, and the maximum height
to which it should rise is 2 meters, as shown below:
1
2 meters
30
What is the maximum length of the seesaw? (6 points)
Select one:
a. 3.00 meters
b. 3.5 meter
C. 4,00 meters
d 4.5 meters

Answers

Answer: 4.00

Explanation

To find the maximum value for x, the hypotenuse, with a given of an angle 30° and a height of 2 m, we can see that 30° is directly opposite the side of 2 m, in which case we may use the sin of 30° to find the hypotenuse.

Remember that the sin = opposite/hypotenuse, so sin30° = 2/x

1) sin30 = 2/x
2) 1/2 = 2/x
3) x = 4

Hope this helps :)

The maximum length of the seesaw is option c  4.00 meters.

What is a right-angled triangle?

A right-angled triangle is one in which one of the angles is equal to 90 degrees. A 90 degree angle is called a right angle, which is why a triangle made up of right angle is termed a right angled triangle.

What are hypotenuse, height of a right-angled triangle?

A right-angled triangle has three sides- hypotenuse, base and height. Hypotenuse is the longest and also the opposite side of the right angle of the triangle, base and height of a right triangle are always the sides adjacent to the right angle.

How to measure the hypotenuse of a right-angled triangle?

The formula for measuring the hypotenuse is,

Height / Hypotenuse = Sinθ , where θ is the angle opposite to the height of the triangle.

In the given question, the seesaw should make an angle of 30° with the ground and the maximum height it should rise is 2 meters so the height here is 2 meters. So the seesaw will make a right angled triangle.

Height = 2 meters, θ = 30°,

Now using the formula,

2 / Hypotenuse = Sin30°

Rearranging we get,

Hypotenuse = 2 / Sin30°

The value of Sin30° is 1/2 and putting the value we get,

Hypotenuse = 2 / (1/2)

                     = 2 × 2

                     = 4 meters.

Therefore, the maximum length of the seesaw (that is the hypotenuse ) is 4 meters.

To learn more about right-angled triangles and finding sides of it click here-brainly.com/question/10331046

#SPJ2

Using a profit P1 of $5,000, a profit P2 of $4,500, and a profit P3 of $4,000, calculate a 95% confidence interval for the mean profit per customer that SoftBus can expect to obtain. (Round your answers to one decimal place.) Lower Limit Upper Limit

Answers

Answer:

Confidence Interval

Lower Limit = $4,233.3

Upper Limit = $4,766.7

With 95% confidence, the mean profit per customer that SoftBus can expect to obtain is between $4,233.30 and $4,766.7 based on the given sample data.

Step-by-step explanation:

The z-score of 95% = 1.96

             Profit         Mean      Square Root

                          Difference    of MD

P1        $5,000       $500        $250,000

P2         4,500          0              0

P3         4,000       -500         $250,000

Total $13,500                        $500,000

Mean $4,500 ($13,500/3)    $166,667 ($500,000/3)

Standard Deviation = Square root of $166,667 = 408.2

Margin of error = (z-score * standard deviation)/n

= (1.96 * 408.2)/3

= 266.7

= $266.7

Confidence Interval = Sample mean +/- Margin of error

= $4,500 +/- 266.7

Lower Limit = $4,233.3 ($4,500 - $266.7)

Upper Limit = $4,766.7 ($4,500 + $266.7)


Which of the following is equivalent to 5 + 5x > 8(x-1) ?
-3x > -12
3x 13
3x < 6
-4X > -12

Answers

5+5x>8(x-1)

5+5x>8x-8

5x-8x>-8+5

-3x>-3

5 + 5x > 8(x-1) is equivalent to -3x > -13.

How to estimate the equivalent function to 5 + 5x > 8(x-1) ?

Let, the expression be 5 + 5x > 8(x-1)

By applying Multiplicative Distribution Law, we get

5 + 5x > 8x - 8

Rearrange unknown terms to the left side of the equation, then

5x - 8x > -8 - 5

Combine like terms, we get

-3x > -8 - 5

Calculate the sum or difference

-3x > -13

Divide both sides of the inequality by the coefficient of the variable, then we get

[tex]$x < \frac{-13}{-3}$[/tex]

Determine the sign for multiplication or division:

[tex]$x < \frac{13}{3}$[/tex]

Therefore, the correct answer is -3x > -13.

Complete question:

Which of the following is equivalent to 5 + 5x > 8(x - 1)?

-3x > -12

3x < 13

3x < 6

-4x > -12

To learn more about algebraic expression

https://brainly.com/question/4344214

#SPJ2


I need you guy’s help answer thanks so much

Answers

I believe it’s C, hopefully this helps !!

Muka saved 476.60. He gave Kelvin 429.10 and bought T-Shirt for 432.05, how much money he has left over​

Answers

Definitely a typo in there he’d be in debt

I need to know the answer ASAP

Answers

Answer:

Step-by-step explanation:

Answer:

A

Step-by-step explanation:

The numerical coefficient is sqrt(8/3), so all you have eliminated is D.

Now you have to consider the literal all by itself.

sqrt(x^2)/sqrt(x) can be written as (sqrt(x^2/x)) = sqrt(x)

x^2 when divided by x leaves x

another way of looking at it is sqrt(x)*sqrt(x) / sqrt(x) = sqrt(x)

So the answer is sqrt(8/3 * x)

Find the measure of the missing angles.

Answers

Answer:

b = 53

c = 53

Step-by-step explanation:

Alright so we already know that b and c are going to have the same angle measures. We can find b by subtracting 180 degrees to 127. Why you may ask? Its because when b and 127 are added together its obvious that it creates a straight line (supplementary angle). This means that two angles will sum up to 180 degrees. We can create an easy equation and solve for b.

127 + b = 180

b = 53 and c = 53

Best of Luck!

5x-22 3x +105 x minus 22 3 X + 10 ​

Answers

-291x+10

:)))))) Have fun

Samantha bought m candies at the store. There are n candies in a pound, and each pound costs c dollars. Write an expression for how much Samantha paid.

Answers

Answer:

total = m/n * c

m/n gives u the number of pounds u have bought, multplied by the cost of the candies per pound gives u the total amount of money she paid

what is 127/14 simplified?

Answers

It’s would be 9 1/4

Answer:

9 1/14

Step-by-step explanation:

127 ÷14

127 divided by 14 equals

9 with a remainder of 1

Two lines, A and B, are represented by equations given below:

Line A: y = x − 2
Line B: y = 3x + 4

Which of the following shows the solution to the system of equations and explains why?

(−3, −5), because the point does not lie on any axis
(−3, −5), because the point satisfies both equations
(−4, −8), because the point satisfies one of the equations
(−4, −8), because the point lies between the two axes

Answers

9514 1404 393

Answer:

  (b)  (−3, −5), because the point satisfies both equations

Step-by-step explanation:

Any solution to a system of two equations must satisfy both equations. The only reasonable explanation of "why" is the one associated with the answer shown above.

7 people can pave a driveway in 9 hours. how long will it take for 11 people to pave a driveway? ​

Answers

Answer:

Step-by-step explanation:

If 7 people can pave the drive in 9 hours, we can use that information in equation form to find out how long it would take 1 person to pave the drive alone.

[tex]\frac{7}{x}=\frac{1}{9}[/tex] and cross multiply

x = 63. That means that it would take 1 person, working alone, 63 hours to get the job done. If that be the case, and assuming that the 2 added people work at the same rate as do the first 9, we simply divide that time alone into 11 parts.

It would take 11 people [tex]5.\bar{27}[/tex] hours to pave that driveway.

Help me please and thank you

Answers

Answer:

D. 3

Step-by-step explanation:

Answer:

3

step by step explanitation

Find the 97th term of the arithmetic sequence 17, 26,35,...

Answers

Hy mate!!

The answer of your question is in the attachment..!!

.

.

Hope this answer helps you..!!

.

.

Select it as the BRAINLIEST..!!

PLEASE HELP FAST!! WILL GIVE FIRST PERSON THAT RESPONDS A HIGH RATING AND POINTS!

Answers

Answer:

Step-by-step explanation:

3

find area and perimeter of shaded area and the perimeter is not 96

Answers

Answer:

picture not clear what is the length

Nine Increased by the product of a number and 4 is greater than or equal to -15

Use the variable y for the unknown number

Answers

Answer:

9+4y ≥ -15

y ≥ -6

Step-by-step explanation:

Nine Increased by the product of a number

9+4y

is greater than or equal to -15

9+4y ≥ -15

Subtract 9 from each side

9-9+4y ≥ -15-9

4y ≥ -24

Divide by 4

4y/4 ≥ -24/4

y ≥ -6

A route up a mountain is 20 Km long. john followed this route at an average speed of xkm/h. write down an expression in terms of x,for the number of hours he took to walk up the mountain.​

Answers

Answer:

20/x

Step-by-step explanation:

speed = distance /time

x km/h is speed

20 km is distance

x= 20/t

t= 20/x

Speed = d/t
T = d/ speed
T = 20/ X

A toy rocket is shot vertically into the air from a launching pad 9 feet above the ground with an initial velocity of 88 feet per second. The height h, in feet, of the rocket above the ground at t seconds after launch is given by the function
h(t) - 16^2 + 88ft +9. How long will it take the rocket to reach its maximum height? What is the maximum height?
The rocket reaches its maximum height at ____ second(s) after launch.
(Simplify your answer.)

Answers

Answer:

Step-by-step explanation:

The position function for this is:

[tex]s(t)=-16t^2+88t+9[/tex]. We can use this equation to find the position (or height) of the rocket at ANY TIME during its flight. I could find out the height of the rocket at 3 seconds by plugging in a 3 for t and solving for s(t); I could find the height of the rocket at 12 seconds by plugging in a 12 for t and solving for s(t), etc.

The first derivative of position is velocity:

v(t) = -32t + 88.

If we are looking for the time the rocket reaches it max height, we need to remember from physics class that this happens when the velocity of the object is at 0. We set the velocity equation equal to 0 then and solve for t:

0 = -32t + 88 and

-88 = -32t so

t = 2.75 seconds. This means that 2.75 seconds after the rocket is launched, it reaches its max height. In order to find what that max height is we plug 2.75 into the position equation for t and solve:

[tex]s(2.75)=-16(2.75)^2+88(2.75)+9[/tex] to get that

s(2.75) = 130

The max height is 130 feet and it reaches this point at 2.75 seconds into its motion.

Joe used a project management software package and has determined the following results for a given project.: Expected completion time of the project = 22 days Variance of project completion time = 2.77 What is the probability of completing the project over 20 days?

Answers

Answer:

0.1151 = 11.51% probability of completing the project over 20 days.

Step-by-step explanation:

Normal Probability Distribution

Problems of normal distributions can be solved using the z-score formula.

In a set with mean [tex]\mu[/tex] and standard deviation [tex]\sigma[/tex], the z-score of a measure X is given by:

[tex]Z = \frac{X - \mu}{\sigma}[/tex]

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Expected completion time of the project = 22 days.

Variance of project completion time = 2.77

This means that [tex]\mu = 22, \sigma = \sqrt{2.77}[/tex]

What is the probability of completing the project over 20 days?

This is the p-value of Z when X = 20, so:

[tex]Z = \frac{X - \mu}{\sigma}[/tex]

[tex]Z = \frac{20 - 22}{\sqrt{2.77}}[/tex]

[tex]Z = -1.2[/tex]

[tex]Z = -1.2[/tex] has a p-value of 0.1151.

0.1151 = 11.51% probability of completing the project over 20 days.

What is the largest value of A according to the division operation given above?
A)300 B)314 C)400 D)450

Answers

Answer:

Hello,

Answer B

Step-by-step explanation:

Since A=15*20+B and B<15

The max for B is 14

==> 300+14=314

Find a12 for the geometric sequence -4, -2, -1, -1/2, ...

Answers

9514 1404 393

Answer:

  -1/512

Step-by-step explanation:

The first term is -4, and the common ratio is -2/-4 = 1/2. Then the n-th term is ...

  an = -4·(1/2)^(n-1)

and the 12th term is ...

  a12 = -4(1/2)^(12 -1) = -4/2048

  a12 = -1/512

Find x on this triangle

Answers

Answer:

I didn't find the answer in the options

the height of the bigger triangle is 11√6/√3 = 11√2

x = 11√2 × √2 = 11×2 = 22

Answered by GAUTHMATH

Intelligence quotients (IQs) on the Stanford-Binet intelligence test are normally distributed with a mean of 100 and a standard deviation of 16.

Use the 68-95-99.7

Rule to find the percentage of people with IQs between 84 and 116.

Answers

Answer:

Approximately 68% of people have IQs between 84 and 116.

Step-by-step explanation:

The Empirical Rule states that, for a normally distributed random variable:

Approximately 68% of the measures are within 1 standard deviation of the mean.

Approximately 95% of the measures are within 2 standard deviations of the mean.

Approximately 99.7% of the measures are within 3 standard deviations of the mean.

In this problem, we have that:

Mean of 100, standard deviation of 16.

Percentage of people with IQs between 84 and 116.

84 = 100 - 16

116 = 100 + 16

So within 1 standard deviation of the mean, which, by the Empirical Rule, is approximately 68%.

Other Questions
Please help!! :)For this circuit, what will be the voltage drop across R1? A. 21.3 VB. 14.2 VC. 45.0 VD. 9.47 V Lucy's dog sleeps 14 hours a day. What percent of the day does her dog spend sleeping? A data set includes data from student evaluations of courses. The summary statistics are n=89, x=3.44, s=0.67. Use a 0.05 significance level to test the claim that the population of student course evaluations has a mean equal to 3.50. Assume that a simple random sample has been selected. Identify the null and alternative hypotheses, test statistic, P-value, and state the final conclusion that addresses the original claim.What are the null and alternative hypotheses?A.H0: =3.50H1: >3.50B.H0: =3.50H1: give two reasons why the speaker didnt listen to the birds what do you mean by scope? mention the scope of population education, health education and environment education. Theodore recently hired a contractor to do some necessary work. On the final bill, Theodore was charged a total of $715. $315 was listed for parts and the rest for labor. If the hourly rate for labor was $50, how many hours of labor was needed to complete the job? highlights four drawbacks of direct production help please dilations geometry l nh vy phi nh vy bn c hiu khng my ny sng ny long v lanh bn on ti ang ngh g we -------- solar panels in the schoolyard while you are checking cracks in the water pipes Rewrite the sentence in repored form The trackpad/touchpad on my laptop is acting unusual. When I click on something or move to an area, it jumps or moves to another area. What would be a good troubleshooting step to try and resolve this issue? a. Use a mouse instead b. Remove all possible contact points, and test again while ensuring only a single contact point c. Refer caller to user guides d. increase the brightness of the display Find the quotient of -196/4 MC Qu. 97 Bioclean Co. sells a biodegradable... Bioclean Co., a merchandiser, sells a biodegradable cleaning product and has predicted the following sales for the first four months of the current year: Jan. Feb. March April Sales in Units1,800 2,000 2,200 1,700 Ending inventory for each month should be 30% of the next month's sales, and the December 31 inventory is consistent with that policy. How many units should be purchased in February 1. In the deathbed scene in "What We Plant, We Will Eat, why is the elder son furiouswith his father?a. His father gives everything to his brother.b. His father is not as rich as he thought.C. His father follows the law of the land.d. His father requires him to share. Rovolution of China from 1956 to 1960 Write the quadratic equation whose roots are 2 and 5, and whose leading coefficient is 4.URGENT PLS please help again with translations PLZ PLZ PLZ PLZ hurry 29 cm21 cmWhat is the length of the missing leg?acentimeters