Answer:
1570f³t
Step-by-step explanation:
V=πr²h
V=3.14×10²×5
V=3.14×100×5
V=314×5
V=1570
Zara travelled in a train moving at an average speed of 120km/h and covered a distance of 40km towards East. i. Calculate the time taken by the train to cover this distance.
Answer:
20 minutes
Step-by-step explanation:
Distance= 40 km
Speed= 120 km/h
Time= distance/speed= 40/120= 1/3 hour= 20 min
Answer:
Time = 0.33 hrs
Step-by-step explanation:
Given:
Speed = 120 km/hr
Distance = 40 km
Required :
Time = ?
Formula:
Speed = Distance/Time
Solution:
Time = Distance / Speed
Time = 40/120
Time = 0.33 hrs
greatest common factor of (12x^3-9x^2)+(8x-6)
Answer:
[tex](4x-3)(3x^2)+2)[/tex]
Step-by-step explanation:
Answer:
The greatest common factor for the first parenthesis is 3 and the greatest common factor for the second parenthesis is 2
Step-by-step explanation:
Hope this helps plz mark brainliest!
divide a number line from 0 to 1 into 8 equal lengths. What should he label the first tick mark to the right of 0?
Answer:
1/8
Step-by-step explanation:
since it is divided to 8 equal parts then the first tick is 1/8
Is 1.06 greater than 0.6
Answer:
it is
Step-by-step explanation:
The length of human pregnancies from conception to birth is normally distributed with mean 266 days and standard deviation 16 days. What is the proportion of the lengths of pregnancies that fall between 250 days and 282 days?
Please put the answer in the standard deviation percentages!
Answer:
68% of the lengths of pregnancies fall between 250 days and 282 days.
Step-by-step explanation:
The Empirical Rule states that, for a normally distributed random variable:
68% of the measures are within 1 standard deviation of the mean.
95% of the measures are within 2 standard deviation of the mean.
99.7% of the measures are within 3 standard deviations of the mean.
In this problem, we have that:
Mean = 266
Standard deviation = 16.
What is the proportion of the lengths of pregnancies that fall between 250 days and 282 days?
250 = 266 - 16
So 250 is one standard deviation below the mean.
282 = 266 + 16
So 282 is one standard deviation above the mean.
By the Empirical Rule, 68% of the lengths of pregnancies fall between 250 days and 282 days.
Answer:
[tex]P(250<X<282)=P(\frac{250-\mu}{\sigma}<\frac{X-\mu}{\sigma}<\frac{282-\mu}{\sigma})=P(\frac{250-266}{16}<Z<\frac{282-266}{16})=P(-1<z<1)[/tex]
And we can find this probability with this difference and using the normal standard table or excel:
[tex]P(-1<z<1)=P(z<1)-P(z<-1)= 0.8413-0.1587= 0.6826[/tex]
So then we will have approximatetly 68.26% of the values between 250 and 282 days
Step-by-step explanation:
Let X the random variable that represent the The length of human pregnancies from conception to birth, and for this case we know the distribution for X is given by:
[tex]X \sim N(266,16)[/tex]
Where [tex]\mu=266[/tex] and [tex]\sigma=16[/tex]
We are interested on this probability
[tex]P(250<X<282)[/tex]
And the best way to solve this problem is using the normal standard distribution and the z score given by:
[tex]z=\frac{x-\mu}{\sigma}[/tex]
If we apply this formula to our probability we got this:
[tex]P(250<X<282)=P(\frac{250-\mu}{\sigma}<\frac{X-\mu}{\sigma}<\frac{282-\mu}{\sigma})=P(\frac{250-266}{16}<Z<\frac{282-266}{16})=P(-1<z<1)[/tex]
And we can find this probability with this difference and using the normal standard table or excel:
[tex]P(-1<z<1)=P(z<1)-P(z<-1)= 0.8413-0.1587= 0.6826[/tex]
So then we will have approximatetly 68.26% of the values between 250 and 282 days
Which of the following source documents is used to summarize all of the costs incurred for a specific job?
Answer:
job cost sheet.
Step-by-step explanation:
When planning or working on a specific project/job all the actual costs that are incurred for that job are written down in the job cost sheet. This report is an entire compilation that should be created by the accounting department and then distributed to all the members of the management department who then analyze it and determine whether the job was correctly bided. This sheet gets updated as the job is undergoing and fully completed when the job is closed.
1 Point
In mathematics, when we talk about a(n) we are talking about some of
the people, places, or things under consideration.
Answer:
Population
Step-by-step explanation:
In mathematics, when we talk about the people, places, or things under consideration, we are referring to the population. The Population is the entire sum of objects in a study. When a researcher wants to study factors that concern a particular set of people, places, or things, the group under study is the population. For example, the researcher might want to do a study on the amount of food consumed by Brazilian students in the year 2019. The Brazilian students represent the population, because they are the group of people being studied.
The population under study might sometimes be difficult to study as a whole. For example, the study of the entire Brazilian students might be cumbersome. In such cases, a sample can be drawn from the population and studied, or the population narrowed down a little more, so that it can be easily studied.
I don’t understand? Please help!
Find the sum of the geometric series 1 + 0.8 + 0.8^2 +0.8^3 + ... + 0.8^{19}
Answer:
S20 ≈ 4.942
Step-by-step explanation:
Sum of a geometric series is expressed as Sn = a(1-rⁿ)/1-r if r<1
a is the first term
r is the common ratio
n is the number of terms
Given the geometric series
1 + 0.8 + 0.8^2 +0.8^3 + ... + 0.8^{19}
Given a = 1,
r = 0.8/1 = 0.8²/0.8 = 0.8
n = 20 (The total number of terms in the series is 20)
Substituting this values in the formula above.
S20 = 1(1-0.8^20)/1-0.8
S20 = 1-0.01153/0.2
S20 = 0.9885/0.2
S20 ≈ 4.942
what is the arc measure of minor arc DE in degrees?
help lol
Answer:
DE= 39°
Step-by-step explanation:
(4w+ 4 )+(4w+8)= 180
Solve for w
8w + 12 = 180
8w = 180-12
8w = 168
W= 21°
(4w+ 4)+(2w+11)+DE = 180
But w= 21°
((4*21 )+4)+((2*21)+11)+DE = 180
88 + 53 + DE = 180
DE = 180-88-53
DE= 39°
PLEASE HELP ME
Angles PTQ and STR are vertical angles and congruent.
Circle T is shown. Line segments T P, T Q, T R, and T S are radii. Lines are drawn to connect points P and Q and points S and R to create secants. Angles P T Q and R T S are congruent.
Which arcs are congruent?
Arc S P and Arc S R
Arc P Q and Arc S R
Arc P Q and Arc Q R
Arc S P and Arc P R
Answer:
PQ AND SR on ED
Step-by-step explanation:
Based on vertical angle theorem, arcs that are congruent is option (B) arc P Q and arc S R is the correct answer.
What is vertical angle theorem?The vertical angles theorem is a theorem that states that when two lines intersect and form vertically opposite angles, each pair of vertical angles has the same angle measures. A pair of vertically opposite angles are always equal to each other.
For the given situation,
Angles PTQ and STR are vertical angles and congruent.
Line segments T P, T Q, T R, and T S are radii.
So, T P = T Q = T R = T S.
The two sides T P = T Q and T R = T S and [tex]\angle PTQ = \angle RTS[/tex],
then by SAS similarity theorem two triangles,
Δ PTQ ≅ Δ STR.
When two triangles are congruent, then the corresponding arc are also congruent.
The congruent central angles intercept congruent arcs PQ and SR.
Hence we can conclude that based on vertical angle theorem, arcs that are congruent is option (B) arc P Q and arc S R is the correct answer.
Learn more about vertical angle theorem here
https://brainly.com/question/17702030
#SPJ2
what is the equation of the graph that represents the parent function f(x) = x4 stretched vertically by a factor of 2, and then shifted down 3 spaces
Answer:
f(x) = 2x^4 - 3
Step-by-step explanation:
First multiplying by 2 giving f(x) = 2x^4 stretches it vertically by factor 2.
Then subtract 3 to move it down 3 units:
f(x) = 2x^4 - 3.
Answer:
g(x)=2x^4-3
Step-by-step explanation:
Area of composite shapes
Find the area of the shape shown below.
Answer:
32 units
Step-by-step explanation:
The large triangle on top has an area of 20, cause 4*10 = 40
40/2 = 20.
the square on the bottom has an area of 4, well, cause 2*2 = 4.
The smaller triangle on the left has an area of 2, cause 2*2=4
4/2=2
The triangle on the right, has an area of 6, because 6*2=12
12/2=6
20+4+2+6 = 32
Answer:
32 Units =)
Step-by-step explanation:
Thomas is in charge of selling roses for the Graduation dance. The roses sell for $3.50 each. He estimates that the expenses of the roses will be $30. Thomas wants to write an equation for the profit.
Answer:
P= $3.5x -$30
Step-by-step explanation:
Let the number of roses Thomas bought and sold be x.
Hence the total selling price would be;
$3.5 × x= $3.5x
The profit = selling price-expenses
P= $3.5x -$30
Sue invests £9000 in an account for one year.
At the end of the year, interest is added to the account.
Sue pays tax on this interest at a rate of 20%.
She pays £30.24 tax.
Work out the percentage interest rate for the account.
Answer:
The interest rate = 1.68%
Step-by-step explanation:
Sue invests £9000 in an account for one year.
She pays £30.24 at a rate of 20%
So 20% of the interest =£ 30.24
Let the interest be x
X0.2= 30.24
X=£ 151.2
The total interest was£ 151.2
The rate R at which generated this interest
R = (100*151.2)/(1*9000)
R= 15120/9000
R= 1.68%
The interest rate = 1.68%
The sum of three consecutive even integers is 186. Find the Integers.
Answer:
60, 62, 64
Step-by-step explanation:
Let x, (x + 2) & (x+ 4) be three consecutive even integers.
[tex] \therefore \: x + (x + 2) + (x + 4) = 186 \\ \therefore \:3x + 6 = 186 \\ \therefore \:3x = 186 - 6 \\ \therefore \:3x = 180 \\ \therefore \:x = \frac{180}{3} \\ \therefore \:x = 60 \\ \implies \\ x + 2 = 60 + 2 = 62 \\ x + 4 = 60 + 4 = 64[/tex]
Hence, the three consecutive even integers are 60, 62 and 64.
Jar A contains four liters of a solution that is 45% acid. Jar B contains five liters of a solution that is 48% acid. Jar C contains one liter of a solution that is k % acid. From jar C, 2/3 liters of the solution is added to jar A, and the remainder of the solution in jar C is added to jar B. At the end both jar A and jar B contain solutions that are 50% acid. Find k.
Answer:
k= 80%
Step-by-step explanation:
Jar A contains 4*0.45 L acid, and 4 L of a solution of acid.
Jar B contains 5*0.48 L acid., and 5 L of a solution of acid.
Jar C contains 1*k/100 = k/100 acid, and 1 L of a solution.
50% = 0.5
For jar A.
(2/3)*k/100 L acid is added to jar A.
Now jar A contains 4*0.45 L + (2/3)*k/100 L acid, and it has (4+2/3)L of a solution.
L solute/L solution = 0.5
[4*0.45 L + (2/3)*k/100 L]/(4+2/3)L = 0.5
[1.8 + (2k/300)]/[(12+2)/3] = 0.5
[1.8 + (2k/300)]/[14/3] = 0.5
[1.8 + (2k/300)]= 0.5*(14/3)
(2k/300) = 0.5*(14/3) - 1.8
2k = (0.5*(14/3) - 1.8)*300
k = (0.5*(14/3) - 1.8)*300/2 =80
k= 80%
We also can find k using jar B.
(1/3)k/100 L acid is added to jar B.
Now jar B contains 5*0.48 L+ (1/3)k/100 L acid, and it has (5+1/3) L of a solution.
L solute/L solution = 0.5
[5*0.48 L+ (1/3)k/100 L ]/(5+1/3)L= 0.5
[5*0.48 + (1/3)k/100 ]/(5+1/3)= 0.5
This equation also gives k=80%
Check.
We can check at least for jar A.
Jar A has 4L solution and 4*0.45=1.8 L acid.
2/3 L of the solution from jar C was added, and now we have 4 2/3 L of solution.
(2/3)* 80%= (2/3)*0.8 acid was added from jar C.
Now we have [1.8 +(2/3)*0.8] L acid in jar A.
L solute/L solution = [1.8 +(2/3)*0.8] L /(4 2/3) L = 0.5 or 50% as it is given that jar A has 50% at the end.
The graph of f(x) is reflected across the x-axis. Write a function g(x) to describe the new graph. g(x)=
Answer: g(x) = -f(x)
Step-by-step explanation:
When we have a point (x, y) and we reflect it over the x-axis, the end result of the reflection is the point (x, -y)
In this case we have a function reflected, and we know that we can write a function as (x, f(x))
So when we reflect it, the result will be (x, g(x)) = (x, -f(x))
So we have g(x) = -f(x)
PLEASE ANSWER ASAP (exponential and logarithms)
Answer:
1.4650 (the first option in the list of possible answers)
Step-by-step explanation:
Start by isolating the exponential expression on one side of the equal sign, thus subtracting 2 from both sides:
[tex]2+3^x=7\\3^x=7-2\\3^x=5[/tex]
Now, in order to solve for "x", we need to lower the exponent, and for that purpose we use logarithm base "3":
[tex]3^x=5\\x=log_3(5)[/tex]
In order to find this logarithm, we use the change of base formula:
[tex]log_3(5)=\frac{log(5)}{log(3)} =1.46497...[/tex]
which rounded to four decimals gives: 1.4650
Item 4 Find the perimeter of the window. Round your answer to the nearest tenth. 90 cm
Answer:
Step-by-step explanation:
item 4 Find the perimeter of the window. Round your answer to the nearest tenth. 90 cm
You did not state the diameter or radius of the window
so, i will use 90cm as the diameter of the window
First, I'd calculate the half circumference of the window.
The formula for circumference is [tex]c = 2\pi r[/tex],
Half of it would just be [tex]c/2 = r\pi[/tex]
Since our diameter is 90 cm, our radius is 45 cm.
Circumference =
[tex]=45\pi \\= 141.37 cm[/tex]
circumference is also the same with perimeter
so, the answer is 141.37cmto nearest tenth = 141.4cmAnswer:
141.4cm
Step-by-step explanation:
=>
please give barinlist
What’s the correct answer for this question?
Answer:
C.
Step-by-step explanation:
60° in Radians = 1.047
Using Formula
s=rθ
s= 7(1.047)
s ≈ 7.36
Solve the equation: 7(8 - 5z) + 17 = 3
Answer:
z=2
Step-by-step explanation:
56-35z+17=3
73-35z=3
-35z=-70
z=2
What is the dominan of the function f(x)= -6x+7
Answer:
(-∞,∞)
Step-by-step explanation:
It's just a line
Answer:
INFINITIE, INFINITIE
Step-by-step explanation:
The expected duration of the project (average) is 30 days and variance is 16. 1. What is the probability that the project will be completed on day 32 or earlier? 2. Suppose the official deadline for the project is 34 days. What is the probability that the project will be delayed?
Answer:
1. 69.15% probability that the project will be completed on day 32 or earlier
2. 15.87% probability that the project will be delayed
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean [tex]\mu[/tex] and standard deviation(which is the square root of the variance) [tex]\sigma[/tex], the zscore of a measure X is given by:
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:
[tex]\mu = 30, \sigma = \sqrt{16} = 4[/tex]
1. What is the probability that the project will be completed on day 32 or earlier?
This is the pvalue of Z when X = 32. So
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
[tex]Z = \frac{32 - 30}{4}[/tex]
[tex]Z = 0.5[/tex]
[tex]Z = 0.5[/tex] has a pvalue of 0.6915
69.15% probability that the project will be completed on day 32 or earlier
2. Suppose the official deadline for the project is 34 days. What is the probability that the project will be delayed?
This is 1 subtracted by the pvalue of Z when X = 34. So
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
[tex]Z = \frac{34 - 30}{4}[/tex]
[tex]Z = 1[/tex]
[tex]Z = 1[/tex] has a pvalue of 0.8413
1 - 0.8413 = 0.1587
15.87% probability that the project will be delayed
correct answer gets brainliest Please explain as well 3x+5y=21 4x-2y = -24
Answer:
x=-3 y=6
Step-by-step explanation:
it was a easyone ,don't forget to mark me as a brainlinest .☺️
Find the future value of 575 at 5.5% compounded quarterly for 5 years. Round to the nearest cent
Answer:
Future value = $755.61 ( to the nearest cent)
Step-by-step explanation:
The formula for calculating the future value of an invested amount compounded periodically for a number of years is given as:
[tex]FV = PV (1+\frac{r}{n} )^{n*t}[/tex]
where:
FV = future value = ???
PV = present value = $575
r = interest rate in decimal = 5.5% = 0.055
n = number of compounding periods per year = quarterly = 4
t = time of investment = 5 years
∴ [tex]FV = 575 (1+\frac{0.055}{4} )^{4*5}[/tex]
[tex]FV = 575 (1+0.01375)^{20}\\FV = 575 (1.01375 )^{20}\\FV = 575 * 1.3141\\FV = 755.607[/tex]
∴ Future value = $755.61 ( to the nearest cent)
What is the volume of the cylinder below?
O A. 70K units
O B. 2257, units
O C. 1757 units
O D. 357 units
Answer:
V = V = 175 pi units^3
Step-by-step explanation:
The volume of a cylinder is given by
V = pi r^2 h
V =pi ( 5)^2 ( 7)
V = 175 pi units^3
A triangle undergoes a sequence of transformations. First the triangle is dilated by a scale factor of 1/3 about the orgin. The the triangle is reflected over the x axis. Finally, the triangle is translated left 3 units and up 2 units. How does the image triangle compare to the preimage triangle
Answer:
Since there was a dilation, the two triangles will be similar. The scale factor is less than one and is a reduction, therefore, the image will be smaller than the pre-image.
What assumptions do you need to make about the shape of the population distribution of all possible tax preparation times to make inferences about the mean time to complete a tax form?
Answer:69
Step-by-step explanation:
Because i am smart.
Can someone plz help me solved this problem I need help plz help me! Will mark you as brainiest!
Answer:
4
4
Step-by-step explanation:
x litres of 15% solution + y litres of 19% solution= 8 gallons of 17% solution
disinfectant content of the final solution= 8*0.17= 1.36 gallons
0.15x+0.19y=1.36
x+y= 8 ⇒ x=8-y
0.15*(8-y)+0,19y= 1.361.2-0.15y+0.19y=1.360.04y=0.16y= 0.16/0.04y=4 gallonsx= 8-4= 4 gallons